final closure meaning in Chinese
最后封闭
最终接近
Examples
- Generally reclamation engineering includes seawall , sluice and final closure
围海工程一般包括海堤、水闸、堵口三部分。 - When the method of mud displacement by blasting is used to improve a foundation , treatment of the final closure is always the key and difficult point for quality control
摘要采用爆破挤淤法进行基础处理时,合龙口一直是质量控制的重点和难点。 - While the desirability of a " clean break " underlies uk divorce law , this is not the case in irish law , he states , and the divorce act " failed to acknowledge that divorce is a point of final closure of an irretrievable marriage "
对“清楚分离”的愿望源自英国离婚法,但爱尔兰法律不一样,他说, 《离婚法案》未能承认,离婚的时候是一桩无法挽救婚姻终结的时候。 - The paper deals with the problems developed in the treatment of the final closure for the southern dike for a project , analysis of the causes of the problems , plans for solving the problems and results of the treatment , thus enriching the theory and experience of mud displacement by blasting
本文介绍了某工程南堤合龙口处理中出现的问题、原因分析、处理方案及效果,从而丰富了爆破挤淤施工的理论和经验。 - So according to the technology regulation of reclamation engineering , hydraulic calculation must be carried out in the design of final closure . this paper firstly introduces the progression and present situation of reclamation engineering , emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood , the variation of time interval , multi - entrance , multi - reservoir capacity ) , and after comparing and analyzing a great deal of schemes , the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct , so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow , the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing
本文首先介绍围海工程的发展进程与国内外围海的开发现状,重点介绍了我国目前围海工程的特点及在围海工程实践中积累的经验和理论;利用fortran语言完善堵口工程龙口水力计算程序,使程序可以满足围海工程复杂工况下(如考虑内港洪水、计算时段的变化、多口门、多库容、多水闸)的龙口水力计算,并进行大量方案的比较和分析,提出合理计算方案;利用面向对象的可视化编程语言vb进行界面开发,使计算过程有良好的人机界面,更直观地对计算结果进行分析和处理;计算结果的后处理采用vb编程实现龙口水力要素最大值等值线图的绘制;并运用所编软件对福建省福清市东壁岛围垦工程进行龙口水力计算,为堵口合龙提供科学依据。